Pedra do Sal 18 MW Wind Power Plant

Parnaíba – Piauí - Brazil
04/2008 – 01/2009

General Management, Coordination, Supervision and Technical support for the implementation of the works to the Wind Power Plant that was part of the Program of Incentives for Alternative Energy Sources (PROINFA).

Project's main data:

  • 20 wind turbine generators, each of 900 kW power;
  • 5 km of internal access road built on dunes;
  • 6 km of 13.8kV internal transmission line;
  • 27 km of 69kV transmission line;
  • 20 units of 600V/13.8kV 2MVA;
  • 13.8/69kV 15MVA step‐up substation.
Fortaleza Metro – South Line

Fortaleza Metro – South Line

Coordination and supervision for the assembly of 25 units of AnsaldoBreda’s rolling stock.

Fortaleza Metro – Line East

Fortaleza Metro – Line East

Coordination and supervision for implementation of the civil works for Consortium Cetenco - ACCIONA.