Central Geradora Eólica

Canoa Quebrada – 10,5 MW
Lagoa do Mato – 4,2 MW
06/2007 a 10/-  Aracati – Ceará - Brazil

General management, coordination, supervision and technical assistance to the implementation of the Wind Power Plant.

The services include also design analysis, factory inspection of components and insurance of Work Safety control of the site.

Project Description:

Implementation of Wind Power Plant, part of the Program of Incentives for Alternative Energy Sources (PROINFA).

Main data:

  • 5+2 wind turbine generators, each of 2.1 MW power;
  • 3 km of internal access road built on dunes;
  • 3,5 km of 13.8 kV internal transmission line;
  • 12 km of 13.8 kV transmission line;
  • 24 km of 69 kV transmission line;
  • 7 pcs of 600V/13.8 kV 2 MVA unit substations;
  • 13.8/69kV 15MVA step‐up substation.
Eólica Icaraizinho

Eólica Icaraizinho

Eólica Icaraizinho – Geração e comercialização de energia S.A.

Fortaleza Metro – Line East

Fortaleza Metro – Line East

Coordination and supervision for implementation of the civil works for Consortium Cetenco - ACCIONA.