Foz do rio choró 25.2 mw Wind Power Plant

Beberibe - Ceará - Brazil
06/2007 – 11/2008

General management, coordination, supervision and technical assistance to the implementation of the Wind Power Plant.

The services include also design analysis, factory inspection of components and insurance of Work Safety control of the site.

Project Description:

Implementation of Wind Power Plant, part of the Program of Incentives for Alternative Energy Sources (PROINFA).

Main data:

  • 12 wind turbine generators, each of 2.1MW power;
  • 4 km of internal access road built on dunes;
  • 8 km of 13.8 kV internal transmission line;
  • 44 km of 69 kV transmission line;
  • 12 pcs of 600V/13.8kV 2MVA unit substations;
  • 13.8/69kV 25MVA step‐up substation.
Fortaleza Metro – South Line

Fortaleza Metro – South Line

Coordination and supervision for the assembly of 25 units of AnsaldoBreda’s rolling stock.

Fortaleza Metro – Line East

Fortaleza Metro – Line East

Coordination and supervision for implementation of the civil works for Consortium Cetenco - ACCIONA.